Fatih drill ship starts work on third exploration well
The ship will drill for gas for 2.5 months at a depth of 5,000 meters below sea level.
The ship will drill for gas for 2.5 months at a depth of 5,000 meters below sea level.
The fourth drill ship with seventh-generation advanced technology has a maximum operating depth of 3,600 meters.